Builder Name:Jeff Seaborn   -  
Project:   Dalotel DM165   -   VIEW REPORTS
Total Hours:653
Total Flight Time:
Start/Last Date:Nov 06, 2019 - Nov 06, 2019
Engine:Originally Continental IO-346 A what? Yep, an IO-346 as used in Muskateers of the same vintage
Propeller:A Regy Wooden Fixed Pitch What the heck is that? A French prop from that era
Panel:Steam gauges circa 1969. In French and in metric. Yikes!
 
Friendly URL: https://eaabuilderslog.org?s=jseaborn

Home or Last Project Picture

Oct 22, 2021     Elevator trim wiring - (1 hour)       Category: Electrical
Inspected and traced the wiring for the elevator trim servo. The wiring is in two sections. The first section runs from the cockpit back to the tail where the electrical connector is to be mounted to the frame. The second section plugs into that connector and then runs to the trim servo in the elevator.

Tested the wiring and all connections and although they're 50 years old, they still work. I'm going to replace all the wiring however so I wanted to trace it all and ensure I understood the connectors.

Opened the connectors and cleaned out the silicone potting material that was used originally. Cleaned up all the pieces and once I get some new wire, I'll rebuild the electrical bundles.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.